Procurement / The YAKU Journal
Record container freight rates in 2021: planning strapping component orders around them
Drewry's index stood above $10,000 per 40ft container in September 2021. How to plan order size, landed cost and timing for buckles, seals, clips and strap.
Part of the YAKU industry timeline 2016–2026. Written as of October 2021; regulations, prices and technology may have changed since.
At a glance
- Drewry's composite index stood at $10,377.19 per 40ft container on 23 September 2021, almost four times its level a year earlier.
- Sea-Intelligence measured global schedule reliability at 33.6% in August 2021.
- Compare offers on landed cost per piece, because container fill can outweigh small price differences.
- Plan replenishment on a late arrival, and agree in writing who books and pays for freight.
In the week to 16 September 2021, Drewry’s World Container Index rose for the 22nd week in a row, to $10,374.64 per 40ft container, as reported by Hellenic Shipping News. A week later the composite held at $10,377.19, almost four times its level a year earlier, after CMA CGM and Hapag-Lloyd said they would stop raising spot rates (report of 25 September 2021). On individual lanes the figures were higher still: Shanghai to Genoa stood at $13,646.
Reliability fell at the same time. Sea-Intelligence reported that global schedule reliability dropped to 33.6% in August 2021, the lowest in the ten years it had tracked the measure, with late vessels arriving an average of 7.57 days behind schedule.
For buyers of packaging components, those two numbers change the arithmetic of ordering. Freight that used to be a small share of landed cost can become a large one, and arrival dates are hard to predict. This guide looks at how to plan orders for buckles, seals, clips and strap under these conditions.
Compare landed cost per piece, not price per carton
When freight is cheap, comparing ex-works prices is a reasonable shortcut. When a container costs what it did in September 2021, it is not. Build the comparison on landed cost per usable piece:
Landed cost per piece = (goods + freight + insurance + duties and clearance + local delivery) ÷ pieces received
An illustrative example: if a container’s freight costs $10,000 and it carries 1,000 cartons, freight adds $10 per carton. If the same freight is spread over only 500 cartons because the order was split, it adds $20 per carton. The figures are hypothetical, but the effect is real: in a high-rate market, how full the container is can matter more than a small difference in unit price.
Weight or volume: know which limit you reach first
Metal components are dense. Cartons of steel buckles, seals and clips may reach a container’s weight limit well before its volume is used, while rolls of woven or PET strap take more space for their weight. Combining dense and bulky items in one shipment can use both limits better. Plan the mix with your forwarder before confirming quantities, using the packing data described below.
Order size and frequency
High freight rates favour fewer, fuller shipments. Long and unreliable transit favours holding more stock. For consumables both point the same way, towards larger, less frequent orders, provided you can store them dry and fund the inventory.
| Approach | Advantage in 2021 conditions | Watch-out |
|---|---|---|
| Full container loads, less often | Freight spread over more pieces | Cash tied up and storage space needed |
| Consolidating several items | Uses weight and volume together | One delay affects every item |
| Groupage (LCL) for small top-ups | Avoids paying for an empty container | Extra handling and its own rate volatility |
| Local distributor for urgent gaps | Short lead time | Check the exact variant and finish |
Plan for a late arrival, not an average one
With only about one vessel arrival in three on schedule in August 2021, plan replenishment on a late arrival rather than the published transit time. Count back from the date the components must be on the packing line, add the delays you have actually experienced in 2021, and place the order accordingly.
Unreliable schedules also change what a late order costs. If a sailing is rolled, the goods wait at origin; if a vessel arrives late and bunched with others, the container may wait at the destination terminal. Ask your forwarder how many free days apply at each end before storage, demurrage or detention charges start, and who pays them under your delivery terms. A cheap freight quote with a short free period can end up dearer than a higher one with more time. Where one consolidated shipment carries several variants, label every carton clearly by item, as the distributor identification guide describes, so that a partly delayed or partly inspected load can still be booked in correctly.
Decide who carries freight risk
Where the seller arranges main carriage, a quotation made in a rising market may carry a short validity on the freight element, or price freight separately at the time of shipment. Where the buyer arranges carriage, securing the booking is your task. Either way, agree in writing who books, who pays, and what happens if a sailing is cancelled or rolled. The international procurement guide covers delivery terms and responsibilities.
Give the quotation the data freight planning needs
Container planning fails when the shipping data arrives after the order is placed. Ask for each item’s carton quantity, gross carton weight and carton dimensions in the quotation itself, and for pallet configuration where goods travel palletised. Where a value is still on request, keep it visible as an open point rather than estimating it. The RFQ checklist lists the product details that should sit alongside that packing data, so that the quantity you plan to ship is the item you mean to buy.
Plan your next order with YAKU
Send your item list, weekly usage, preferred delivery point and whether you book the freight yourself through the enquiry page. Browse galvanized wire buckles, steel strapping seals, sheet metal clips and woven strap to build the list.
Sources and further reading
External references provide context. They do not certify a YAKU product or validate a particular strapping system.
Technical articles are general guidance. Joint performance, suitability and load capacity need to be verified for the actual strap, component, tool and application.
More from 2021Back to the journal